The public consultation of theRSPO Integrated Complaints System was conducted on 9th of September 2015 in Kuala Lumpur. Following to the public consultation, internal workshop with RSPO Secretariat was conducted on 10-11 September 2015 in RSPO Office. Ridge to Reef has developed a document based on the inputs and comments obtained during the public consultation and internal workshop.
The draft of document is now open for public comments for 60 days, starting from 9th October to 9th December 2015. The document and the Comments Form can be downloaded below.
Please send the comments form by 9 December 2015 to [email protected].
Keep reading

Test Voices
Public Consultation: PalmGHG V5 Manual
Malaysia National Interpretation Public Consultation: 25 July 2025 – 24 September 2025
India National Interpretation Public Consultation: 25 July 2025 – 24 September 2025

From Cocaine Processing to Cultivating Palm Oil: Resilience takes root in a Colombian community

Social Sustainability in Focus at the Europe Sustainable Palm Oil Dialogue

Cost-Benefit Analysis To Sourcing Sustainable Palm Oil in India

RT2025 Early Bird Sponsorship ends soon!
